Week 1 — Map & demo
List every spreadsheet your auditors actually sample: NCR log, CAR tracker, hazard/incident lists, training matrix, SWMS index, supplier list. Start a 7-day demo and match each sheet to a Veridian register or document library item. Decide your tier (ISO 9001, 14001, 45001 or combined).
Week 2 — Documents & open actions
Issue controlled policies and procedures from the document library — retire duplicate Word/Excel copies from shared drives. Import open NCRs, CARs and incidents via CSV (see below). Leave closed historical rows in archive folders if you prefer; auditors usually sample recent open items and live operation.
Week 3 — Field & ownership
Invite site supervisors and quality/safety reps to the portal. Install the mobile app from the portal (no app store). Run one real workflow end-to-end: hazard or incident → CAR → verification. Assign register owners so updates do not fall back to a shadow spreadsheet.
Week 4 — Audit in the system
Run an internal audit checklist in the portal. Close findings as CARs with due dates and evidence attachments. Export a Word/Excel evidence pack. Only then retire the old master spreadsheet for that register — keep a read-only export if your policy requires it.